It is a hybrid PV/Wind park with 24 x 3MW V112 turbines and 17.25 MWp PV Solar Park. Execution time was 98 days from Contract Signature to Signed Completion Certificate.

Ground Based

Small Waterplant

2015

17.25 MWp

Inverter: 750 * SMA STP 20000
Module: Talesun 250Wp poly

  • 69,000 pcs 250 Wp Poly panels
  • 750 pcs 20 kW string inverters with Cluster Controller Network in fiber
  • Subconstruction in hot-dip galvanized steel with 5 horizontal row architecture
  • 38 pcs of 400 kVA 0.4-10 kV transformers (due to cap in Danish legislation of max 400 kW per unit)

7. marts 2016